Tag Archives: construction progress

Wilton Pop Top

Jun 2015

The alteration up in Wilton is cranking along. The guys on site got the roof on before the rough weather hit so the existing house was spared relying on tarps for the real cold stuff. Not far from being closed in, and the deck bridge structure is in place. Awesome day up on site for these pictures catching the last of the winter western sun.

Continue reading

Almost Fully Closed In

Dec 2013

The main part of the exterior works are drawing to a close for the medical centre. Internal fitout is under way with much of the services going in. Shouldn’t be long till the scaffold is down and the bulk of the building will be properly seen for the first time. New street awning to come in the new year.

Continue reading

Roof just about finished

Nov 2013

Last pieces of butynol to go down and the medical centre will be fully roofed.

Internal layouts for all floors taking shape, first fit for many of the trades about to take place so site is about to become very busy. Aim is to have all cladding and painting done before Christmas break so scaffolding can come down.

Continue reading