Roof just about finished

shop interior on Riddiford Street

Nov 2013

Last pieces of butynol to go down and the medical centre will be fully roofed.

Internal layouts for all floors taking shape, first fit for many of the trades about to take place so site is about to become very busy. Aim is to have all cladding and painting done before Christmas break so scaffolding can come down.

shop interior on Riddiford Street

shop interior on Riddiford Street

Main entry off Riddiford Street

Main entry off Riddiford Street

framing ready for stairwell windows

framing ready for stairwell windows

Top of stairwell tower

Top of stairwell tower

Roof deck on top floor

Roof deck on top floor

Final butynol going down on plywood substrate

Final butynol going down on plywood substrate

A roof with a view

A roof with a view