Author Archives: David Melling

Studio closed in and nearing completion

Jan 2014

We’ve been working on the conversion of an garage to a 45m2 studio following a sketch design done by Gerald Melling. Its lofty 3.5m stud can be appreciated now the linings are on. Awaiting the final pieces mac trim, the exterior is almost complete. Geoff Askew and his team are doing a fine job.

Continue reading

Almost Fully Closed In

Dec 2013

The main part of the exterior works are drawing to a close for the medical centre. Internal fitout is under way with much of the services going in. Shouldn’t be long till the scaffold is down and the bulk of the building will be properly seen for the first time. New street awning to come in the new year.

Continue reading

Roof just about finished

Nov 2013

Last pieces of butynol to go down and the medical centre will be fully roofed.

Internal layouts for all floors taking shape, first fit for many of the trades about to take place so site is about to become very busy. Aim is to have all cladding and painting done before Christmas break so scaffolding can come down.

Continue reading